2005-2006
2006-2007
2007-2008
2008-2009
2009-2010
2010-2011
Service High School Phase 3 Construction (Aux Gym/Boiler) and Phase 4 Design (Admin/IMC)   $10,000,000        
Service High School Phase 4 Construction (Admin/IMC) and Phase 5 Design (Cafeteria/Auditorium)     $12,000,000      
Service High School Phase 5 Construction (Cafeteria/Auditorium)       $25,000,000    
Abbott Loop Elementary School Planning       $65,000    
O'Malley Elementary School Planning       $65,000    
Service High School Phase 6 Design (Parking/Athletic Fields)         $1,000,000  
Abbott Loop Elementary School Design         $800,000  
O'Malley Elementary School Design         $800,000  
Service High School Phase 6 Construction (Parking/Athletic Fields)           $8,000,000
Abbott Loop Elementary School Construction           $8,000,000
O'Malley Elementary School Construction           $8,000,000

Bartlett | Chugiak | Dimond | East | Service | South | West | Districtwide

Projects with attached dollar amounts will require funds to be obtained. After 2006-07, scope and costs are estimates and require verification. Both may be adjusted based on recommendations from Facilities resulting from preliminary design and facility audits.

Return to Table of Contents | Section IV

 


Anchorage School District logo