Birchwood ABC Elementary

AWWU Sewer Project

The Anchorage Water and Wastewater Utility's (AWWU) Northern Communities sewer project is designed to hook up Chugiak High and Birchwood Elementary schools to city sewer.  This project will be done over multiple years with the work starting in June 2006.  Over the 2006 summer AWWU will have a contractor at Chugiak High and Birchwood Elementary working on the on-site underground piping.  The campuses have been closed to rental usage during this time. Visit AWWU online for more information about the Northern Communities Project.

 

Bond information

April 2008
Proposition 3 passed April 1, 2008
Proposition 3 funds districtwide building system renewal projects, including the following project at Birchwood Elementary:

  • Replace intercom/bell/clock system

Visit Birchwood ABC Elementary's web site

 

Past Bond Information

April 2007
Proposition 5 passed April 3, 2007
Proposition 5 funded building systems renewal projects across the district. At Birchwood ABC Elementary School, it funded the following improvements:

  • Mechanical projects

April 2006
The April 2006 bond did not include funds for any projects at Birchwood ABC Elementary.

November 2004
The November 2004 bond did not include funds for any projects at Birchwood ABC Elementary.

April 2004
The projects proposed in Proposition 4, 5, and 6 were researched by professional engineers and facility managers, reviewed by citizens on the Capital Request Advisory Committee, and publicly scrutinized and approved by the School Board and Assembly. The following is a list of projects for Birchwood:

  • Replace galvanized water piping (Proposition 4 passed April 6, 2004.)

April 2003
Propositions 9, 10 and 11 were developed with the support of the Capital Request Advisory Committee (made up of parents, students and a good cross section of community members), the Anchorage School Board and the Anchorage Assembly. Proposition 9 funds repair and major maintenance projects at most schools districtwide. Proposition 9 passed April 1, 2003.

  • Asbestos/Code/ADA/Fire Sprinklers
  • Electrical
  • Mechanical
  • Roof repair/replacement
  • Traffic safety
  • Restroom repair/renewal
  • Sewer/water/drainage
  • Lock/door upgrades

April 2002
Propositions 5 and 6 were developed with the support of the Capital Request Advisory Committee (which represents parents, students and a good cross section of community members), the Anchorage School Board and the Anchorage Assembly. This rigorous public process helps ensure that the most critical needs throughout the municipality are addressed and that the community's investment in school facilities is protected. Propositions 5 and 6 passed April 2, 2002.

  • Minor Renewal
  • Electrical
  • Mechanical
  • Traffic Safety
  • Public Sewer/Water

 